Water Waste Treatment – Agfa Graphics
Constructing An Internal Waste Water Treatment Facility
Waste Water Facility
Client: Unilever UK
We received an initial client design brief from Agfa, and appointed a structural consulting engineer to provide a workable detailed solution for the overall scheme.
This challenging project was built inside an existing building to reduce the environmental impact on the surrounding area.
This scope of works included providing reinforced concrete floors, bund walls, sumps, a 4.0m high pre-cast water treatment facility and associated drainage. The project was completed with galvanised steelwork, staircases, and gantries.
Value: £200k | Duration: 12 weeks
View project image gallery below…